Myriad.Video Case Study
Get Demo
Case StudyMyriad.Video

How Spingle helped
Myriad.Video win a
$400,000 IBM contract

From 780 manual hours to 190. A story of transformation, speed, and winning enterprise deals.

01

The Struggle

M

Myriad.Video

Enterprise Conference Production

Films large-scale tech conferences with multi-editor teams and massive footage volumes.

The Core Challenge

Every project: mountains of raw footage. The challenge wasn't capturing great content—it was finding it.

🎬
130
Hours Raw Footage
👥
5
Editors Per Project
📹
12+
Camera Angles
Typical Project Timeline
30
Days Total
Day 1-3: Footage Ingest
Day 4-10: Manual B-roll Sort
Day 11-18: Multi-cam Sync
Day 19-25: Rough Cut Creation
Day 26-30: Client Revisions
02

The Pain

"
Editing consumed 780 manual hours per project. Our best editors spent more time sorting than storytelling.
M
Myriad.Video Team
Post-Production Lead

Time Allocation: Before Spingle

Hours spent per project phase

Prep & Organization520 hrs
Creative Editing260 hrs
Total Manual Hours780 hrs
Manual B-roll sorting
Multi-cam syncing
Finding key moments
Version management
03

The Turning Point

Then they discovered Spingle

Spingle's AI-powered video editing tools transformed their entire post-production workflow. Three key capabilities changed everything:

Spingle AI Assistant
🎯
40x faster
Automated B-Roll Categorization

AI-powered tagging sorted thousands of clips by content, emotion, and relevance—in minutes, not days.

🎬
24x faster
Smart Multi-Cam Setup

Automatic audio sync across 12+ camera angles. What took 2 days now takes 2 hours.

Instant
Rapid Rough-Cut Generation

Generate multiple narrative versions instantly. Test "Option A vs Option B" without the manual labor.

Workflow Transformation

The Before & After

See how Spingle revolutionized each workflow stage

Old Workflow
With Spingle
📁
B-Roll Organization
40x faster
Before
3-5 days
After
2 hours
🎬
Multi-Cam Sync
24x faster
Before
2 days
After
2 hours
✂️
Rough Cut Creation
Instant
Before
1 week
After
15 minutes
🔍
Finding Key Moments
720x faster
Before
4-6 hours
After
30 seconds
⏱️
590 hrs
Total Time Saved
📈
75%
Efficiency Gain
💰
$29.5K
Cost Reduction
04

The Leap

Before
⚠ RAW_UNSORTED/
NO SYNC
⚠ 130+ hrs unsorted
12 CAM ANGLES
780
Manual Hours
After Spingle
✓ AUTO-CATEGORIZED/
Keynotes
Interviews
B-Roll
Crowd Shots
✓ Synced • Categorized • Ready for creative
190
Spingle Hours
0%
Faster Editing
0
Hours Saved / Project
$0
Saved in Editor Costs
05

The Win

Contract Closed
$0K
IBM Enterprise Deal

How Speed Won the Deal

Faster Turnaround

Spingle cut editing time by 75%, enabling rapid delivery of conference videos.

🎯
Multiple Story Angles

Quick rough-cut generation meant testing different narratives for IBM's brand voice.

🏆
Competitive Edge

When IBM needed a partner who could match their pace, Myriad was ready.

"
Spingle didn't just save us time—it enabled us to win business we couldn't have competed for before. Speed became our competitive advantage.
M
Myriad.Video Team
Enterprise Video Production
Efficiency
75% faster delivery
💰
Revenue
$400K enterprise contract
🎨
Creative Freedom
More time for storytelling
📈
Scale
Handle 2x more projects
Key Takeaway

Spingle directly enabled enterprise revenue growth, not just efficiency. Speed became a competitive advantage in winning major contracts.

Spingle

Ready to transform your workflow?

Join leading video production teams who've cut their editing time by 75% and unlocked enterprise-level opportunities.

Trusted by video production teams worldwide

Enterprise Ready
24/7 Support